NHS trusts in England spent about £14.4 billion running their estates in 2025/26 and used around 11 billion kWh of energy.1 The NHS in England aims for net zero by 2040 for the emissions it controls, NHS Scotland by 2040 with renewable heat in all NHS-owned buildings by 2038, and NHS Wales has interim targets of a 34% cut by 2030 and no fossil CHP after 2035.4,6,8,9 The grid electricity carbon factor for 2026 reporting is about 0.13 kg CO₂e per kWh.11
Figures checked 18 November 2026. Each links to its source below; the guides linked in each section explain what the numbers mean for an estate.
The size of the estate
| Figure | What it is |
|---|---|
| £14.4bn | Cost of running the NHS estate in England, 2025/26 (ERIC)1 |
| ~11bn kWh | Energy used by the NHS estate in England in a year (ERIC)1 |
| ~£1.3bn | Estimated NHS energy bill, almost double its 2019 level2 |
| £15.9bn | Backlog maintenance in the English NHS estate, 2024/253 |
See ERIC, EFPMS and benchmarking.
Net zero targets
| Figure | What it is |
|---|---|
| 2040 | England: net zero for the NHS Carbon Footprint (emissions it controls), with an 80% cut by 2028 to 20324 |
| 2045 | England: net zero for the Carbon Footprint Plus, including the supply chain4 |
| 68%+ | England: reported fall in directly controlled emissions since 19905 |
| 2038 | Scotland: renewable heating in all NHS-owned buildings6 |
| 2040 | Scotland: whole NHS estate net zero, or earlier6 |
| 34% | Wales: interim emissions cut by 2030 (16% by 2025)8 |
| 2035 | Wales: all fossil-fuelled CHP decommissioned; no new fossil CHP installed9 |
| 2035 | Independent sector: IHPN ambition for providers to reach net zero20 |
See NHS net zero targets in England, Scotland and Wales.
Carbon factors and CHP
| Figure | What it is |
|---|---|
| 0.13 | kg CO₂e per kWh of grid electricity, UK government factor for 2026 reporting (0.177 for 2025)11 |
At that factor, a typical gas CHP engine now emits more than buying grid electricity and making the heat in a boiler. Our worked comparison puts the CHP route about a third higher, and more than twice grid electricity with a heat pump; see moving away from gas CHP for the assumptions.
Funding
| Figure | What it is |
|---|---|
| 2027/28 | Public Sector Decarbonisation Scheme: no new rounds beyond this; Phase 4 projects run to 31 March 202812 |
| £510 | PSDS Phase 4 cap on grant per tonne of CO₂e saved over a project's life13 |
| £100m | Great British Energy funding for NHS trust solar and batteries (March 2025): 132 projects at 78 trusts14 |
| 162 | NHS sites in England with completed solar through the programme by May 2026, with £25m more for up to 40 sites15 |
| £74m | Clean energy and efficiency upgrades shared by 82 NHS trusts, eight military sites and a prison (February 2026)16 |
See funding for healthcare decarbonisation.
The biggest single saving
| Figure | What it is |
|---|---|
| 132 to 286 MWh | Energy saved per operating theatre each year by switching off or setting back ventilation when empty17 |
| ~3,300 | Operating theatres in England17 |
| 25 to 30 min | Active ventilation needed before a theatre is used after a long shutdown17 |
See theatre ventilation and base load and the worked example, where a failed setback costs a community hospital about £31,000 a year.
Reporting and procurement rules
| Figure | What it is |
|---|---|
| 10% | Minimum weighting for net zero and social value in NHS procurements since April 202218 |
| April 2024 | Carbon reduction plan required for all new NHS procurements18 |
| 1 April 2027 | Stricter carbon reduction plan standard for contracts of £5m a year or more and new frameworks19 |
| 31 Dec 2026 | ESOS Phase 4 qualification date for large undertakings, including private hospital groups21 |
See private and independent hospitals.
Sources
Checked 18 November 2026.
- NHS England Digital: Estates Returns Information Collection, summary page and dataset for ERIC 2025/26
- Portsmouth Hospitals University NHS Trust: extra solar panels funded by Great British Energy (27 October 2025)
- Building Better Healthcare: ERIC 2024/25 shows £15.9bn maintenance backlog (31 October 2025)
- NHS England: Delivering a net zero NHS
- NHS England: Five years of a greener NHS, progress and forward look
- Scottish Government: NHS Scotland climate emergency and sustainability strategy 2022 to 2026 (sustainable buildings and land)
- Scottish Government: NHS Scotland climate emergency and sustainability annual report 2025
- Hywel Dda University Health Board: decarbonisation action plan reporting (NHS Wales interim targets)
- Welsh Government: NHS Wales decarbonisation strategic delivery plan 2025 to 2030, Part 6: buildings and land
- NHS England: NHS Net Zero Building Standard
- Department for Energy Security and Net Zero: Greenhouse gas reporting, conversion factors 2026
- Salix Finance: Public Sector Decarbonisation Scheme update
- Salix Finance: Phase 4 Public Sector Decarbonisation Scheme, project criteria
- NHS England: £100 million from Great British Energy for NHS trusts to install solar panels and battery storage (21 March 2025)
- Great British Energy: first anniversary announcement (15 May 2026)
- GOV.UK: Clean energy upgrades for hospitals and military sites (February 2026)
- NHS England: NHS Estates Technical Bulletin 2026/1, generating energy efficiency savings through controlling theatre ventilation (July 2026)
- NHS England: Greener NHS, suppliers and the net zero supplier roadmap
- NHS England: 2027 NHS carbon reduction plan requirements for the procurement of NHS goods, services and works
- Independent Healthcare Providers Network: Net Zero Commitment
- GOV.UK: How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4
Questions people ask
How much energy does the NHS use?
NHS trusts in England used around 11 billion kWh of energy in a year, according to the Estates Returns Information Collection, and spent about £14.4 billion running their estates in 2025/26.
When does the NHS have to reach net zero?
In England, 2040 for emissions the NHS controls directly and 2045 including the supply chain. NHS Scotland aims for 2040, with renewable heat in all NHS-owned buildings by 2038. NHS Wales has interim targets of 16% by 2025 and 34% by 2030.
What is the grid carbon factor for 2026?
About 0.13 kg CO2e per kWh in the UK government conversion factors for 2026 reporting, down from 0.177 for 2025.
How much energy does theatre ventilation setback save?
NHS England estimates 132 to 286 MWh per operating theatre each year, across about 3,300 theatres in England.